31715001 - Rev F - TRACE 1300 and TRACE 1310 Gas Chromatographs Preinstallation Requirements Guide
Ensure the preinstallation requirements for the TRACE 1300/1310 GC are met before the Thermo Fisher Field Service Engineer arrives. Verify the entrance dimensions, workbench space, lighting, power, and LAN network requirements. Confirm environmental conditions, gas equipment, and cryogenic cooling supplies are ready. Inspect the received shipment for damage and complete the Installation Request Form.
Description:
This guide contains preinstallation requirements that must be in compliance before installing the instrument.