065394 - Rev 01 - ICS-5000 Dual Pump and ICS-5000 Single Pump Preventive Maintenance Procedure
The ICS-5000 Dual Pump and ICS-5000 Single Pump Preventive Maintenance Procedure outlines annual maintenance for analytical pumps and every 18 months for capillary pumps. It includes replacing main piston seals, O-rings, check valves, and tubing. A checklist ensures all steps are completed and documented, with an estimated time of 60 minutes per pump.
Description:
These instructions describe a preventive maintenance procedure for the Dual Pump (DP) and the Single Pump (SP). Instructions for analytical pumps and capillary pumps are
included. Dionex recommends performing this procedure annually for analytical pumps and every 18 months for capillary pumps.
Environment:
- ICS-5000 Dual Pump
- ICS-5000 Sing Pump
Attachment(s):
| File | Last Modified |
|---|---|
| 065394 - Rev 01 - ICS-5000 Dual Pump and ICS-5000 Single Pump Preventive Maintenance Procedure | May 04, 2022 |

