065483 - Rev 01 - Dionex ICS-5000+ Dual Pump and Dionex ICS-5000+ Single Pump Preventive Maintenance Procedure
The ICS-5000+ Dual Pump and Single Pump Preventive Maintenance Procedure details the annual maintenance required for analytical pumps and every 18 months for capillary pumps. It includes replacing various seals, check valves, and tubing. A checklist is provided to document the completion of each step, ensuring maintenance is performed regularly. The estimated time required is 60 minutes per pump.
Description:
This manual describes a preventive maintenance procedures.
Environment:
- Thermo Scientific Dionex ICS-5000+ Dual Pump (DP)
- Thermo Scientific Dionex ICS-5000+ Single Pump (SP)
Attachment(s):
| File | Last Modified |
|---|---|
| 065483 - Rev 01 - Dionex ICS-5000+ Dual Pump and Dionex ICS-5000+ Single Pump Preventive Maintenance Procedure | May 04, 2022 |

