031739 - Rev 05 - Integrated IC Systems Installation Qualification

The document details the Installation Qualification (IQ) for Dionex ICS systems, covering unpacking, module placement, computer and software installation, electrical and USB connections, and liquid line setup. It includes a general system function test using a test solution. All steps and findings are documented in worksheets, with sections for customer information, facility requirements, system details, and comments.
The document details the Installation Qualification (IQ) for Dionex ICS systems, covering unpacking, module placement, computer and software installation, electrical and USB connections, and liquid line setup. It includes a general system function test using a test solution. All steps and findings are documented in worksheets, with sections for customer information, facility requirements, system details, and comments.

Description: 

Installation Qualification covers all procedures relating to the installation of instruments in a specific environment. IQ confirms that the instrument(s) were shipped as ordered and that the environment where the system is installed is suitable for operating the instrument.

Environment:

  • ICS-90A
  • ICS-900
  • ICS-1100
  • ICS-1600
  • ICS-2100

 