Replacing Major IC Consumables - Chinese
Description:
This video illustrates how to replace the most common IC consumables. After watching this video, operators will be able to complete basic replacing and conditioning operations. Temporary tubing connections with these new consumables need to be setup to remove possible contaminants before these consumables are connected into the system. This video describes 2 suppressor hydration methods and a method for checking the EGC generated eluent with pH paper.
Environment:
- IC Consumables
- Ion Chromatography

