Dionex ICS6000 and an ASAP or ASDV autosampler do not remain synchronized during an automated injection
Issue
The Dionex ICS-6000 and an AS-AP or AS-DV autosampler do not remain synchronized during an automated injection.
One or more of the following may occur:
- The injection valve switches to Inject before sample loading is complete.
- The autosampler is still delivering sample when the IC begins the injection.
- Chromeleon starts data acquisition at the wrong point in the injection cycle.
- The autosampler reports that it is busy when another command is issued.
- Manual autosampler and valve operation works correctly, but automated sequence operation does not.
- Injection synchronization is intermittent or varies between injections.
- Load, Inject, or sample-delivery commands appear to execute in an unexpected order.
- The sequence stops or produces an Audit Trail synchronization, timing, or communication message.
Environment
- Thermo Scientific Dionex ICS-6000
- Dionex AS-AP Autosampler or Dionex AS-DV Autosampler
- Chromeleon CDS
- External autosampler loading an IC injection valve
Resolution
-
Run one injection and determine exactly which event is out of synchronization.
Observe the Chromeleon Audit Trail, autosampler status, IC injection-valve position, and acquisition state during one injection.
Determine whether:
- the sampler finishes loading before the valve switches to Inject,
- the valve switches while the sampler is still loading,
- sample loading finishes correctly but acquisition begins at the wrong time, or
- the next command is issued while the autosampler is still busy.
Do not replace hardware until the failed event has been identified.
-
Review the actual Chromeleon Instrument Method command sequence.
Inspect the method assigned to the affected injection rather than assuming the command order from the ePanel display.
Verify that the logical sequence is:
prepare sampler → place injection valve in Load → deliver/load sample → allow sample-loading operation to complete → switch valve to Inject → acquire data
Look specifically for an Inject or acquisition command occurring before the sample-delivery operation has completed.
-
Do not use a long arbitrary Wait command as the first correction.
A fixed Wait may hide the synchronization problem without correcting its cause.
Delivery time can change with autosampler configuration, sample volume, delivery speed, vial configuration, wash operations, or other method settings.
First determine which operation Chromeleon is waiting for and whether the next command is being issued before that operation completes.
-
For an AS-DV, verify that the load cycle completes before Inject occurs.
The AS-DV physically delivers sample by driving the sampling head against the PolyVial cap. The cap acts as a piston and forces sample through the sample-out line. AS-DV_Service_Manual_Rev_2
Because this is a time-dependent mechanical delivery operation, the IC injection valve must not be switched to Inject before the required sample-loading cycle is complete.
Review:
- installed loop volume,
- delivered volume,
- delay volume,
- flush factor,
- delivery speed,
- vial size,
- vial fill,
- vial/cap condition, and
- whether an optional AS-DV valve is included in the sample path.
-
For an AS-DV, verify the function of LoadPosition and InjectPosition in the Chromeleon method.
Treat the AS-DV Load/Inject commands as synchronization events, not simply as physical movement commands to the sampler.
Verify that the ICS-6000 injection valve is configured to respond at the intended Load and Inject events and that no subsequent method command changes the valve state unexpectedly.
-
Check the AS-DV for a device-busy condition.
Review the Audit Trail for messages indicating that a command is not allowed because the autosampler is busy.
A new command should not be issued while an existing sample-delivery, rinse, vial-position, or other time-consuming operation is still executing.
If a device-busy message occurs, identify the operation still in progress rather than immediately increasing all method delays.
-
For an AS-AP, verify that Chromeleon configuration matches the actual plumbing and injection mode.
Confirm whether the sampler is configured for:
- Push,
- Pull,
- Push Sequential,
- Push Simultaneous,
- full-loop,
- partial-loop, or
- another supported injection arrangement.
Verify that the installed sample loop and configured loop volume agree.
For Push configurations where sample-transfer-line volume is relevant, verify the applicable transfer-line setup/calibration rather than treating the problem solely as valve timing. The AS-AP documentation separates these injection architectures because the sample-delivery paths and timing are not equivalent. Man-IC-AS-AP-Ops-July2025-DOC06…
-
Test communication independently of the automated sequence.
From the appropriate Chromeleon ePanel, manually command the sampler through simple operations.
For the AS-AP, test operations such as:
- move to a known vial,
- wash,
- sample movement where appropriate, and
- valve commands for the installed configuration.
For the AS-DV, test:
- moving to a known vial,
- Load position,
- Inject position, and
- other basic sampler functions appropriate to the configuration.
Confirm that each command is executed consistently and review the Audit Trail for communication errors.
If manual operation is reliable but automated operation fails, prioritize the Instrument Method, sequence timing, or synchronization configuration before suspecting hardware.
-
Create an event timeline from the Chromeleon Audit Trail.
Record the timestamps for:
- sequence/injection start,
- Load or LoadPosition,
- sample-delivery command,
- completion of sample delivery,
- Inject or InjectPosition,
- acquisition start,
- valve transition, and
- any device-busy, timeout, or communication message.
A correct event sequence should show sample loading completing before the Inject transition.
For example:
Load → DeliverSample → delivery complete → Inject → acquisitionIf the Audit Trail instead shows:
Load → DeliverSample → Inject → delivery completetroubleshoot method timing/configuration before replacing the sampler or valve.
-
Verify that sample-loading commands are not occurring during data acquisition.
Review the method for sample-positioning, sample-delivery, rinse, or other long-running autosampler operations occurring after acquisition has already started.
If loading commands are placed inside the analytical acquisition window, correct the Instrument Method so that the loading cycle occurs at the proper synchronization point.
-
Determine whether the system is controlled by Chromeleon, TTL/relay signals, or both.
Check for external TTL or relay control of the sampler or injection cycle.
If Chromeleon software control and an external trigger are both being used, verify that two independent control paths are not initiating overlapping Load or Inject operations.
The AS-DV supports both Chromeleon/USB control and TTL/relay functionality; these control paths should not unintentionally compete with one another. AS-DV_Service_Manual_Rev_2
-
Simplify the method if the synchronization problem remains unclear.
Create a diagnostic sequence containing:
- one vial,
- one stable standard,
- one injection,
- no sample preparation,
- no sample overlap,
- no unnecessary rinse commands, and
- the minimum commands needed to Load, Inject, and acquire.
Run the simplified method several times.
If the simplified injection is synchronized, add method functions back one at a time until the synchronization failure returns.
-
Re-rank the fault based on the test results.
If manual commands are reliable but automated injections are not, prioritize:
- Instrument Method command order
- Load/Inject synchronization configuration
- sample-delivery completion timing
- acquisition timing
- autosampler configuration
- TTL/relay interaction
If manual commands themselves are intermittent, then move communication, device state, valve actuation, or autosampler hardware higher in the fault tree.
-
Verify the correction under the original sequence.
After correcting the synchronization problem, return to the customer's original Instrument Method and sequence.
Verify several consecutive injections and confirm:
- correct sample loading,
- correct Load-to-Inject transition,
- acquisition starts at the intended injection point,
- no device-busy or timing errors occur,
- injection repeatability is acceptable, and
- the failure does not recur when the complete method is restored.
Analysis