Installation Instructions for Dual Eluent Generator (EG) Degassers Setup for Electrochemical Detection
Issue
The eluent generation feature in Integrion and ICS-6000, coupled with pulsed amperometric detection (HPAE-PAD) is a widely used method. For some applications, such as the separation of Fluorodeoxyglucose (FDG) from Fluorodeoxymannose (FDM), which has the Eluent Generator (EG) running constantly at 100mM and 1mL/min, not all residual gases are removed by the eluent degasser during the runs. As a result, some amount of residual gases dissolved in the eluent can cause an unwanted peak and baseline disturbances.
Environment
- ICS-6000
- Integrion
- HPAE-PAD
- Amperometric Detection
- Electrochemical Detection
Resolution
To eliminate a ghost peak and baseline disturbances, the following steps are required to efficiently remove residual gases form the RFIC-EG eluent setup:
- Degas di-H2O in the bottle thoroughly and pressurize the di-H2O bottle with inert gas (N2 or He) at 8 to 10 psi.
- Assemble and use a Dual Eluent Generator (EG) Degasser according to the attached installation instructions. Please note that the previous generation of EG degassers (P/N: 062137, Assy, Degas, EG, Analytical, ICS3) is used in this setup; thus the total backpressure should be below 3000 psi.
Attachment(s)
| File | Last Modified |
|---|---|
| Degasser Assembly Instructions.pdf | May 05, 2022 |