Issue / Symptoms

Pressure fluctuations caused peak shifts between injections, and the customer reported repeated CR-TC replacements with continued instability. During field testing, pressure would not build properly with the application flow path connected and improved when the CR-TC was bypassed.

Environment

Product: PROD, INTEGRION, RFIC, DEGAS, OVEN, TEC
Serial Number: 20083072
Service Ticket: 3931152
Other relevant identifiers: SAP #3975665 follow-up referenced in service notes

Customer-Reported Presentation

The customer reported recent pressure fluctuation that shifted peaks relative to calibration runs and control samples. They noted frequent CR-TC replacement history and said the issue no longer made sense because high-pressure events were not occurring, yet chromatographic shifts continued.

Cause

The most likely cause of the pressure fluctuation and peak shifting was restriction or malfunction at the CR-TC position in the flow path. The strongest evidence is that pressure remained low while the normal application path was connected, but pressure rose as expected when the flow path was worked section by section and the CR-TC was bypassed. Corrosion was observed on piston and piston-base components, but the service record does not show that corrosion was proven to be the direct cause of the primary pressure-shift complaint.

Things Tried and Effectiveness

Action Taken Observed Outcome Effectiveness Toward Primary Issue
Replaced main piston seal on the secondary pump head and found similar buildup on the primary piston base Corrosion or buildup was documented, but pressure-shift cause was not confirmed at that step. Unable to assess
Bypassed consumables and electrolytics with a backpressure coil Basic functionality test passed with water conductivity of 0.660 µS and ripple of 0.6%. Diagnostic only
Replaced multiple fittings, bolts, ferrules, and two Viper lines Helped stabilize the flow path but did not by itself explain the low-pressure condition. Partial improvement
Rebuilt injection valve due to wear between rotor grooves Addressed a separate wear finding, but no direct proof tied it to the main pressure-shift symptom. Partial improvement
Increased flow and worked through the flow path with a pressure coil Pressure reached expected values until the CR-TC position was reached. Diagnostic only
Bypassed the CR-TC with a standard union Pressure returned to expected behavior at 0.25 mL/min. Likely corrective action
Hydrated and installed a new CR-TC Customer completed a calibration successfully and pressure variation improved from about ±150 psi to ±30 psi. Likely corrective action

Resolution

Isolate the flow path with a backpressure coil and section-by-section pressure checks. If pressure remains low until the CR-TC position and normalizes when the CR-TC is bypassed, replace and hydrate the CR-TC, then re-equilibrate and verify injection-to-injection pressure stability.

Isolation / Verification

Only include steps reasonably supported by the evidence.

The engineer bypassed consumables, confirmed base functionality, then restored the application flow path and checked pressure at each connection. Pressure remained abnormal until the CR-TC was bypassed, which localized the restriction. After CR-TC replacement and hydration, the customer successfully created a calibration curve and pressure variation improved substantially.

Verification Outcome

Pressure variation improved from approximately ±150 psi to ±30 psi between injections, and the customer completed a calibration successfully. High background remained as a separate unresolved path at that visit, so this article should remain limited to the pressure-fluctuation symptom.

Confidence

Issue definition: 5/5
Cause: 4/5
Resolution: 4/5
Isolation path: 5/5