Part number and replacement steps for the ICS-6000 pressure transducer
Issue
How to replace the pressure transducer for an ICS-6000 pump.
How to replace the secondary pump head for an ICS-6000 pump.
Note: The pressure transducer is built into the secondary pump head assembly.
What is the part number for the ICS-6000 Pump pressure transducer?
What is the part number for the ICS-6000 Pump secondary pump head?
What is the part number for the ICS-6000 Pump capillary secondary pump head?
Note: The mounting screws for the secondary pump head are unavailable for ordering and can be purchased at a local hardware store. The mounting screws are included with purchase of complete pump heads.
Environment
ICS-6000 SP Pump - Analytical and Capillary
ICS-6000 DP Pump - Analytical and Capillary
Part Number
The ICS-6000 Analytical pump head assembly part number is 083482 and the SAP description for this is: "HEAD ASSY,SECONDARY,PMP,DP,SP "
The ICS-6000 Capillary pump head assembly part number is "075458" and the SAP description for this is: "ASSY,HEAD,SEC,HI PRES UPGRD,TESTED"
Part Image
Resolution
The following steps are used to replace the Secondary Pump Head Assembly:
- Turn off the pump flow.
- Monitor the Current Pressure reading on the pump ePanel on the Chromeleon ePanel Set. When the system pressure reaches zero:
- Disconnect the pump from Chromeleon by clicking "Connected" on the pump ePanel.
- Press the POWER switch on the back of the DP/SP to turn off the pump .
- Open the DP/SP door to access the mechanical components .
- Remove the 2 mounting screws installed on the pump head.
- Wear clean room gloves to prevent contamination of pump parts while disassembling and reassembling the pump head.
- Disconnect all tubing connections to the pump head with the defective piston seal.
- Remove the pump head:
- Be sure to disconnect the pressure transducer cable from position J203 on the main/CPU board for the top pump.
- Be sure to disconnect the pressure transducer cable from position J202 on the main/CPU board for the bottom pump.
- Install the new pump head:
- Place the new pump head back on the pump.
- Reconnect transducer cable to original position on main/CPU board.
- Reinstall the screws in the pump head using a 3.0 mm hex key (P/N 062338). Tighten the screws just until they come into contact with the pump head, then tighten another one-quarter to one-half turn, one-eighth of a turn at a time.
- Reconnect all tubing connections to the pump head. Tighten connections fingertight, then tighten an additional one-quarter turn only.
- Push the component mounting panel back into the enclosure using the handle in the center of the panel. Close the DP/SP door.
- Press the POWER button on the front of the DP/SP to turn on the pump.
- Reconnect the pump to Chromeleon by clicking "Connected" on the pump ePanel.
- Turn on the pump flow and verify pump pressure.


.png?revision=1)