Skip to main content
Thermo Fisher Scientific

BP8_BP16_BIOS 16 Centrifuges - Pre-Installation Checklist

The pre-installation checklist for BP8, BP16, and BIOS 16 centrifuges includes ensuring all account information is recorded, confirming delivery of instruments and accessories, verifying space and electrical requirements, inspecting for shipping damage, checking location clearance and air circulation, performing installation steps such as voltage checks and panel inspections, conducting test runs, and providing customer training on operation and maintenance.

Description: 

Pre-installation checklist

 

Environment:

Centrifuge Models:  

  • BP8 208-240vac, 60Hz.
  • BP16 208-240vac, 60Hz.
  • BIOS 16 208-240vac, 60Hz.