1R120706-0001 - Rev C - Q Exactive GC Mass Spectrometer Preinstallation Requirements Manual
Description:
This Q Exactive GC Preinstallation Requirements Guide is intended primarily for those who are responsible for the site planning of a laboratory in preparation for the installation of a new Exactive Series instrument. This guide should be retained for future guidance if your instrument needs to be relocated in future.
Environment:
Q Exactive GC mass spectrometer
Attachment(s):
File | Last Modified |
---|---|
1R120706-0001 - Rev C - Q Exactive GC Mass Spectrometer Preinstallation Requirements Manual.pdf | September 29, 2022 |