Skip to main content
Demonstrations of using the Nicolet iS50 spectrometer
General use and maintenance
Open the sample compartment
Close the sample compartment
Using the shipping sleeve
Remove the sample compartment cover
Replace the sample compartment cover
Open the beamsplitter hatch
Manually install a beamsplitter
Manually remove a beamsplitter
The ABX Beamsplitter
Install the ABX beamsplitter
Remove the ABX beamsplitter
Remove the ABX beamsplitter cover
Replace the ABX beamsplitter cover
The NIR Module
Remove the NIR module accessory holder
Install the NIR Module accessory holder
Remove the NIR module sample spinner
Install the NIR module sample spinner
Measure a polymer with the sample spinner
Remove the NIR module tablet holder
Install NIR tablet holder
Measure tablet with the tablet holder
The Raman Module
Install the Raman module sample holder
Remove the Raman module sample holder
Measure a tablet using the Raman module
Using the SabIR Probe
Disconnect the SabIR probe
Measure a polymer with the SabIR probe
Using the ATR Module
Use the ATR pressure tower
Change the ATR pressure tip
Measure a solid with the ATR module
Measure a liquid with the ATR module