Integrion Stand-Alone Pre-Installation Checklist Ion Chromatography
The Laboratory Site Requirements Pre-Installation Checklist for the Dionex Integrion HPIC System ensures a smooth installation by verifying infrastructure and logistics. Complete sections A-D, ensure laboratory readiness, and note any special conditions. Submit the completed form to the provided email. Verify requirements for power, space, ventilation, and necessary equipment.
Description:
Laboratory Site Requirements Pre-Installation Checklist Ion Chromatography
Dionex Integrion HPIC General Laboratory Site Requirements Checklist
Environment:
- 22153-60301 Integrion Base System
- 22153-60302 Integrion System with Column Oven and Degas
- 22153-60303 Integrion RFIC System Column Oven and Degas
- 22153-60304 Integrion System with Column Oven, Degas, and Thermostatted Detector Compartment
- 22153-60305 Integrion RFIC System with Column Oven, Degas, and Thermostatted Detector Compartment
- 22153-60306 Integrion RFIC System with Column Oven (no consumables tracking), Degas, and Thermostatted Detector Compartment
Attachment(s):
| File | Last Modified |
|---|---|
| Integrion Stand-Alone Pre-Installation Checklist Ion Chromatography.pdf | November 10, 2021 |

