065484 - Rev 01 - Dionex ICS-5000+ Detector Chromatography Module and Dionex ICS-5000 Thermal Compartment Preventive Maintenance Procedure
The ICS-5000+ Detector/Chromatography Module and Thermal Compartment Preventive Maintenance Procedure outlines the annual maintenance required for high-pressure valves. The procedure includes rebuilding each valve, checking for leaks, and recording maintenance details. It is estimated to take 45 to 60 minutes. A checklist is provided to ensure all steps are completed and documented.
Description:
This manual describes a preventive maintenance procedure for Thermo Scientific Dionex high-pressure valves. The procedure consists of rebuilding each high-pressure valve installed in the Thermo Scientific Dionex ICS-5000+ Detector Chromatography Module DC or the Thermo Scientific Dionex ICS-5000+ Thermal Compartment TC.
Environment:
- Dionex ICS-5000+ Detector Chromatography Module
- Dionex ICS-5000 Thermal Compartment
Attachment(s):
| File | Last Modified |
|---|---|
| 065484 - Rev 01 - Dionex ICS-5000+ Detector Chromatography Module and Dionex ICS-5000 Thermal Compartment Preventive Maintenance Procedure.PDF | December 16, 2021 |

