Preventive Maintenance for AS-DV Autosampler
Details
The article provides a list of the parts, procedures, factory documents, IES documents needed to perform a Preventative Maintenance or PM on a AS-DV Autosampler for an Ion Chromatography Systems. This is also sometimes called PM Kit for AS-DV Sampler, or AS-DV PM Kit.
Preventive Maintenance Kit or PM Kit Part Number
AS-DV Preventive Maintenance Kit (part number 072678)
Time to Complete Preventative Maintenance
1 hours
Documents Required
IES Preventative Maintenance Checklist: ULS-DRS-PMC-0153 002 PMC ICSP ASDV Autosampler.PDF
Factory Preventative Maintenance Procedure: 60-065335 Rev B - Dionex AS-DV Autosampler - Preventive Maintenance Procedure
Description of the work performed
During the Preventive Maintenance (PM) on the Dionex AS-DV Autosamplers, I followed the Preventive Maintenance Instructions (document number Dionex AS-DV Autosampler - Preventive Maintenance Procedure). The tasks performed included replacing the sampling tip and transfer line (071575), lubricating the sampling mechanism, and rebuilding the high-pressure valve. System testing and checking for leaks were conducted to ensure all parts were functioning correctly. All tasks were documented using the Preventive Maintenance Checklist (part number ULS-DRS-PMC-0153).
PM Kit Contents: of Dionex AS-DV Preventative Maintenance Kit 072678
| Part Number | Description | Quantity |
| 071575 | Dionex AS-DV sampling tip assembly |
1 |
Tools Required
| Part Number | Description |
| #1 Phillips screwdriver | |
|
3-mm hex key |
|
| Ethanol | |
| 076541 | TriGEL - 300S Lead Screw Grease - Optional if the sampling head is producing a high-pitched squeak or squeal |
Preventative Maintenance Kits for Optional High-Pressure Valves
| Part Number | Description |
| 068920 | 6-Port High-Pressure Valve |
| 068921 | 10-Port High-Pressure Valve |

