Pre Start-Up Checklist - Barnstead Classic Still 2 and 5 GPH
This form is required for the start-up service for Classic Still water distillation systems. It includes necessary information such as site address, system identification, location requirements, electrical requirements, and water and drain specifications. Emphasizes the importance of having the site ready which avoids delays and additional charges. Users should rename the form with their company name, save a copy for their records, and email the completed form to the provided support email.
Description:
Formerly called Pre-installation checklist, now called pre start-up checklist. This form must be completed by the customer and returned to service dispatch prior to onsite start-up service.
Environment:
- Barnstead Classic Still 2 GPH
- Barnstead Classic Still 5 GPH
- A1013-B-61
- A1013-C
- A1015-B-61
- A1015-C
Attachment(s):
| File | Last Modified |
|---|---|
| PRE START UP CHECKLIST - BARNSTEAD CLASSIC STILLS - REVISED 4 2023.DOCX | April 12, 2023 |

